This project entailed assisting the client in identifying the most hazardous areas across 4 campuses. After consulting with the relevant stake holders, 2500′ (762m) of guardrail, 4 hatch guards, 3 skylight guards, 1 ladder, and 1 crossover stair were installed on 13 buildings. To enhance aesthetics all installed systems were black to best meet the client’s needs. One campus, in particular required additional concrete blocks to stabilize and best protect the counterweights in the green roof areas. To assist the client with future record keeping and compliance, sealed as-built drawings for all projects were completed as well.